On average, laminate flooring installation takes 4 to 5 days, including material acclimation, site preparation, and the actual installation. The installation itself usually takes a few hours to one day, depending on factors such as the type of laminate, room size, and layout. Site preparation involves creating a smooth, level surface and may require removing existing flooring, cleaning the surface, and laying an underlayment if necessary.
Most laminate flooring manufacturers recommend allowing 48 to 72 hours for the flooring materials to acclimate in the space before installation to prevent the planks or tiles from buckling or separating once installed.