Building material shortages, price increases, and what it means for your next project
Near me

Building material shortages, price increases, and what it means for your next project

Near me

Building material shortages, price increases, and what it means for your next project

$400 – $600per 1,000 board feet (lumber)
$1,400 – $1,800per ton (structural steel)
$135 – $160per cubic yard (concrete)

Get free estimates for your project or view our cost guide below:

$400 – $600 per 1,000 board feet (lumber)

$1,400 – $1,800 per ton (structural steel)

$135 – $160 per cubic yard (concrete)


Get free estimates for your project or view our cost guide below:
Are you a pro? Get new customers
Paul Mazzola
Written by
Paul Mazzola
Edited by
Tom Grupa
Fact-checked by
Editorial staff

Building material shortages and price increases

Building material prices have risen 25% to 28% above 2020 levels, and shortages across essential supplies like lumber, steel, concrete, and cement continue to disrupt construction timelines and budgets. Whether you're planning a home renovation, a new build, or a commercial project, understanding these market conditions is critical to protecting your investment.

The construction industry has faced unprecedented volatility since 2020. While some materials have stabilized, others remain elevated or continue climbing. Supply chain disruptions, labor shortages, geopolitical tensions, and surging demand have all converged to create a challenging environment for builders and homeowners alike.

Material Peak Price Increase (From 2020 Levels) Current Status
Lumber Up to 500% Stabilized but above pre-pandemic pricing
Steel ~100% Roughly double pre-pandemic rates
Concrete and cement ~14% Continuing to rise
Drywall ~12% to 20% Elevated
Overall residential materials 25% to 28% Gradual increases expected

This article breaks down which materials are most affected, what's driving these shortages and price increases, and practical strategies to keep your next project on track and on budget.

Get free estimates from building contractors near you.

Key materials experiencing shortages and price spikes

Not all building materials have been affected equally. Lumber dominated the headlines in 2020 and 2021, but the spotlight has shifted to foundation materials like concrete and cement, which are now climbing steadily. Understanding which materials are most volatile helps you plan purchases and timelines more effectively.

Material Pre-Pandemic Benchmark Recent Price Range Key Driver
Lumber (per 1,000 board feet) ~$350 $400 to $600 Mill closures, demand surges
Structural steel (per ton) ~$800 $1,400 to $1,800 Geopolitical tensions, energy costs
Concrete (per cubic yard) ~$120 $135 to $160 Cement shortages, transportation costs
Copper wiring (per pound) ~$2.80 $3.80 to $4.50 Mining disruptions, electrification demand
Roofing materials (per square) ~$80 $100 to $130 Petroleum-based input costs

Lumber

Lumber experienced the most dramatic price swing of any construction material, peaking at roughly five times its pre-pandemic cost in mid-2021. Prices have since pulled back significantly but remain above historical averages. Mill closures during COVID lockdowns, followed by an unexpected boom in home improvement projects and new housing demand, created a supply-and-demand mismatch that took years to correct.

Seasonal fluctuations, environmental regulations limiting logging activity, and ongoing tariffs on imported softwood lumber (particularly from Canada) continue to keep prices elevated compared to 2019 levels.

Steel

Steel prices have essentially doubled since 2020 and remain stubbornly high. This increase affects not only structural framing and rebar but also heavy equipment, appliances, HVAC systems, and metal attachments used throughout construction.

Global demand for steel from rapidly developing economies, combined with energy price increases that raise smelting costs, has kept supply tight. For homeowners, the steel price increase is often felt indirectly through higher costs for metal roofing, ductwork, and reinforced concrete foundations.

Concrete and cement

While lumber prices have moderated, concrete and cement have emerged as the new pressure point. Prices for these foundational materials rose a combined 14% during the third quarter of recent reporting, according to construction cost tracking firm Linesight. Because nearly every construction project requires concrete for foundations, slabs, or driveways, these increases ripple across the entire industry.

Other affected materials

Drywall, insulation, PVC piping, electrical components, and roofing materials have all experienced notable price increases. Many of these materials rely on petroleum-based inputs or metals that face their own supply constraints. Even items as small as screws, adhesives, and sealants have climbed in price.

Keep in mind

Prices vary significantly by region. Materials that are locally manufactured or sourced tend to be more stable than those requiring long-distance shipping or imports. Always check with local suppliers for the most current pricing before finalizing your project budget.

What's causing the shortages and price increases

The pandemic served as a catalyst, but the building material crisis is driven by multiple interconnected factors. Understanding these root causes helps explain why prices haven't simply returned to pre-2020 levels and why some disruptions may persist for years.

Factor Impact Level How It Affects Prices
Supply chain disruptions High Shipping delays, container shortages, port congestion
Labor shortages High Reduced manufacturing capacity, slower transportation
Increased demand High Post-pandemic construction boom, infrastructure spending
Geopolitical tensions Moderate to high Shipping route diversions, trade restrictions, tariffs
Energy cost increases Moderate Higher production and transportation costs
Environmental regulations Moderate Reduced raw material extraction (timber, mining)
Trade barriers and tariffs Moderate Higher import costs, customs delays

Supply chain disruptions

Global supply chains were severely stressed during the pandemic and have not fully recovered. Factory closures, shipping container shortages, port congestion, and reduced production capacities created bottlenecks that cascaded through the entire materials pipeline. These disruptions were not short-lived; delays in one part of the chain created backups that took months or even years to clear.

More recently, geopolitical hostilities have forced shipping routes to change, adding days or weeks to transit times and increasing freight costs. These additional expenses are ultimately passed on to end users.

Labor shortages in manufacturing and transportation

The construction industry and its supply chain face a persistent skilled labor shortage. Workers left the industry during the pandemic, and many have not returned. This affects every link in the chain, from raw material extraction and manufacturing to trucking and on-site installation.

When factories can't operate at full capacity due to staffing issues, production drops. When there aren't enough truck drivers to deliver materials, supplies sit idle while prices climb. These labor challenges are structural, not temporary, making them one of the most stubborn contributors to elevated costs.

Surging construction demand

The pandemic unexpectedly triggered a home improvement and new housing boom. Remote work drove demand for larger homes, home offices, and renovations. Government infrastructure spending added further pressure on available materials. When large-scale commercial and public projects compete with residential builders for the same limited supplies, smaller firms and individual homeowners often find themselves at a disadvantage.

Reduced raw material availability

Certain raw materials face genuine scarcity. Environmental regulations have reduced logging activity in key timber-producing regions. Geopolitical tensions affect mining and metal production. Climate-related events, including wildfires that destroy timber stands and droughts that impact manufacturing operations, add another layer of unpredictability to supply.

How price increases affect project costs

Residential building materials as a whole were projected to cost 7% more in 2023 than the prior year, with an additional 2.7% increase expected in 2024, according to Turner & Townsend's global construction analysis. These compounding increases mean that a project budgeted in 2020 could now cost 25% to 28% more for materials alone.

Project Type Estimated Material Cost Increase (2020 vs. Current) Approximate Additional Cost
New single-family home ($300,000 baseline) 25% to 28% $75,000 to $84,000
Major home renovation ($50,000 baseline) 20% to 25% $10,000 to $12,500
Kitchen remodel ($25,000 baseline) 15% to 20% $3,750 to $5,000
Deck or fence project ($5,000 baseline) 15% to 25% $750 to $1,250

The compounding effect

One of the most critical aspects of these increases is their compounding nature. A 7% annual increase doesn't just add 7% each year; it builds on the already-elevated prices from the previous year. After three consecutive years of dramatic price escalation, the cumulative effect is far greater than any single year's percentage suggests.

For example, $100 worth of building materials in 2020 would cost roughly $125 to $128 by 2024, even if each individual year's increase seemed manageable on its own.

Labor costs add to the equation

Get free estimates from building contractors near you.

Material costs don't exist in isolation. Contractor labor rates have also increased due to the same workforce shortages affecting the broader supply chain. Many contractors now include escalation clauses in their contracts to protect against mid-project price jumps, which shifts more financial risk to the homeowner or project owner.

What this means for homeowners and project planners

For anyone planning a construction project, the current environment demands more careful budgeting, flexible timelines, and proactive communication with contractors and suppliers. The days of locking in a fixed price months in advance and expecting no changes are largely over.

Challenge Potential Consequence Mitigation Approach
Project delays Missed deadlines, penalty fees, extended temporary housing costs Build buffer time into schedules
Budget overruns Eroded savings, reduced project scope, stalled work Add 15% to 25% contingency to budget
Cash flow strain Difficulty paying contractors, work stoppages Secure financing with rate locks where possible
Reduced contractor availability Longer wait times, higher bids Book contractors well in advance
Material substitution needs Aesthetic or performance compromises Identify acceptable alternatives early

Budgeting in an unpredictable market

The most important adjustment homeowners can make is building a larger contingency fund into their project budget. While a 10% contingency was once standard advice, a buffer of 15% to 25% is now more realistic given the volatility of material prices.

Get detailed, itemized estimates from contractors rather than lump-sum bids. This transparency allows you to see exactly where your money is going and identify areas where you might substitute materials or adjust scope if prices spike mid-project.

Timing your project

Seasonal price fluctuations still apply on top of broader market trends. Lumber prices tend to rise in spring and summer when construction activity peaks. If your project timeline is flexible, starting during the off-season (late fall or winter in most regions) may help you secure better material prices and greater contractor availability.

That said, waiting indefinitely for prices to "go back to normal" may not be a winning strategy. With compounding annual increases, the cost of delay can exceed the savings you hope to gain.

Escalation clauses

Many contractors now include escalation clauses in their contracts, allowing them to adjust the final price if material costs rise during the project. Before signing any contract, understand exactly what these clauses cover, what triggers them, and whether there's a cap on how much the price can increase.

Strategies to manage costs on your next project

Despite the challenging market, there are practical steps you can take to control costs and reduce the impact of material shortages on your project. The key themes are early planning, flexibility, accurate estimating, and strong communication with your supply chain.

Strategy Potential Savings Effort Required
Order materials early and lock in prices 5% to 15% Moderate
Use alternative or locally sourced materials 10% to 20% Moderate
Get multiple detailed bids 5% to 15% Low
Phase the project to spread costs Varies Moderate
Use accurate estimating tools 10% to 20% Low to moderate
Buy during off-peak seasons 5% to 10% Low

Plan ahead and communicate early

The single most effective strategy is early planning. Communicate your material needs to suppliers, distributors, and merchants as far in advance as possible. This gives your supply chain partners time to source materials, negotiate pricing, and secure inventory before shortages tighten availability further.

Collaborative communication throughout the entire supply chain, as recommended by industry leadership councils, benefits everyone involved. Contractors who maintain strong supplier relationships are often the first to know about upcoming shortages or price changes.

Consider material alternatives

When a specific material is scarce or prohibitively expensive, explore substitutes that offer comparable performance at a lower cost. For example:

  • Engineered wood products can replace solid lumber in many structural applications
  • Fiber cement siding offers durability similar to wood at more stable pricing
  • Composite decking eliminates the volatility of natural lumber prices
  • Locally manufactured concrete blocks may be cheaper than those shipped from distant suppliers
  • Metal framing can substitute for wood framing in some applications

Discuss substitution options with your architect or contractor early in the design phase, before plans are finalized and changes become costly.

Accurate estimating prevents waste and surprises

Inaccurate quantity takeoffs lead to two expensive problems: ordering too much material (waste) or ordering too little (last-minute purchases at premium prices). Using professional estimating software or hiring an experienced estimator ensures that every item is accounted for in the correct quantity.

When material prices are high, the cost of waste is amplified. A 10% overorder on lumber that once added $200 to a project might now add $400 or more. Precision in planning pays for itself many times over.

Phase your project

Get free estimates from building contractors near you.

If your budget can't absorb current prices for the full scope of work, consider breaking the project into phases. Complete the most critical or time-sensitive portions first, then tackle secondary elements as prices stabilize or your budget recovers.

Phasing also allows you to take advantage of price drops for specific materials. For instance, if steel is elevated now but expected to soften in six months, you might defer the metal roofing phase while completing framing and foundation work.

Market outlook and future projections

The construction materials market is expected to remain elevated, though the pace of increases is slowing. After years of dramatic price escalation, the industry appears to be entering a period of more gradual, inflation-level increases rather than the sharp spikes seen in 2020 and 2021.

Timeframe Expected Trend Key Factors
Near-term (6 to 12 months) Moderate increases of 2% to 5% Inflation, energy costs, labor constraints
Medium-term (1 to 3 years) Gradual stabilization Supply chain recovery, demand normalization
Long-term (3 to 5+ years) New baseline above pre-pandemic levels Structural labor shortages, infrastructure spending

Will prices return to pre-pandemic levels?

For most materials, a return to 2019 pricing is unlikely. The combination of persistent labor shortages, higher energy costs, expanded environmental regulations, and ongoing infrastructure investment creates a structurally higher cost floor. Lumber is the one notable exception where prices have retreated significantly from their peaks, though they remain above historical averages.

Impact on housing affordability

Elevated material costs are a significant contributor to declining housing affordability, which has reached its lowest point in over a decade according to the National Association of Home Builders. Higher construction costs translate directly into higher home prices, keeping budget-conscious buyers on the sidelines.

Single-family home construction has declined meaningfully, with recent years marking the first calendar-year declines in starts since 2011. This reduced building activity limits housing inventory, which paradoxically keeps existing home prices elevated even as demand softens due to higher mortgage rates.

Silver lining

Slower construction activity may eventually help material prices moderate by reducing demand pressure. For homeowners willing to build during quieter market periods, this could create opportunities for more competitive contractor pricing and better material availability.

Frequently asked questions

Which building materials have increased the most in price?

Lumber experienced the most dramatic spike, reaching roughly five times its pre-pandemic price at its peak. Steel has approximately doubled. More recently, concrete and cement have emerged as significant pressure points, with combined increases of about 14% in recent quarters. Overall, residential building materials as a category are 25% to 28% above 2020 levels.

Should I wait to start my construction project?

Waiting for prices to return to pre-pandemic levels is likely not a viable strategy, as most industry analysts expect material costs to remain permanently elevated above 2019 baselines. With compounding annual increases, delaying your project could actually result in higher total costs. The better approach is to build a generous contingency budget, plan material purchases carefully, and work with contractors who communicate proactively about pricing changes.

How much extra should I budget for material cost increases?

Adding a contingency of 15% to 25% above your initial material estimates is prudent in the current market. This buffer accounts for potential mid-project price increases, delivery delays that may force more expensive sourcing, and the escalation clauses that many contractors now include in their contracts.

How can I save money on building materials right now?

Order materials as early as possible to lock in current prices. Consider locally sourced alternatives to reduce shipping costs. Buy during off-peak construction seasons when demand is lower. Use accurate estimating to avoid waste and costly last-minute purchases. Get multiple detailed bids from contractors to ensure competitive pricing. For more tips, see our guide on how to save money when building a house.

Are material shortages getting better?

Supply chains have improved significantly from the worst disruptions of 2020 and 2021, but they haven't fully normalized. Certain materials, particularly those requiring international shipping or reliant on geopolitically sensitive supply chains, remain vulnerable to periodic shortages. Maintaining strong relationships with suppliers and placing orders well in advance remains essential for avoiding delays.