Multiple room remodel
Kitchen
Bathroom
No existing plans, but have a good idea of what I want
No, the project is not covered by an insurance claim
Within the next 3 months
1)One bathroom empty down to framed out studs and unfinished floor. Plumbing is capped for tub, sink and toilet. 2) second bathroom needs to have surround replaced, titles on floor removed and replaced with wood composite flooring, wall tiles need to be removed and replaced with one full wall and two smaller 1/2 covered with Stone Air tile. A new light fixture in the ceiling needs to be put in where there was none and the room needs painting with mildew resistant paint. The vanity needs to be replaced with a new one we already have. We need side tall floor shelves made or bought in the same color. 3) Our kitchen needs more cabinets installed. We already have one wall of cabinets we live the wood tone. We would like it with additional new cabinets with a sink base one and several others. We want to remove plaster soffit above existing cabinets and turn that area into cabinet space. The doors and framing must match the already existing cabinets we have in the kitchen. We will need new doors for the cabinets that hang below that will match everything as well. Once that is completed the room will need to be painted with a washable paint that would be good for a high use kitchen.The tile floor that already exists is staying. Base boards need to be installed around the kitchen.
The pro travels to me