MEBA

MEBA

5.0(2 reviews)
Offers online services
Offers online services

About


Highlights

Hired 7 times
5 employees
34 years in business
Serves Tucson , AZ
Offers online services

Reviews

0.0
0 reviews
5
0%
4
0%
3
0%
2
0%
1
0%

RI

Rey I.

Great communication and pricing. My Project plans got approve right away with the City of Mesa.
... Show more
May 06, 2021
Hired on HomeGuide

JT

Jim T.

Very nice and professional.
... Show more
April 30, 2021
Hired on HomeGuide

Frequently asked questions

Conversation of project scope

Schematic Design

Engineering if needed

Construction Document SET

As-Builts

Over 30 years of experience in commerical and residential architecture.

[email protected]
and
[email protected]


Schematic Design (SDSET):

• No more than 12 hours of Schematic Design time.

• Schematic Design is to ensure validity of home design for property and concept.

• Typically, the schematic design phase takes 1 to 3 weeks.

• 3D rendering for visual concepts are included up to 10




Construction Document SET (CDSET):

• CDSET is designed under the IRC 2018 for home building.

• Any certifications outside of the IRC 2018 guidelines will need to be purchased at the owner’s expense

o [Structural, Topology, Electrical (over amperage), Mechanical (RESCheck)].

• CDSET is for each dwelling or phase and is charged accordingly.

• CDSET for permitting typically takes 4 to 6 weeks from the time of the SDSET.




Interior Design SET (IDSET):

• No more than 8 hours of Interior Design time.

• IDSET is designed with the customer as a mood board.

• IDSET may include: Cabinetry design, Tile, Countertops, Paint, and Furniture Selections (final design pending vendor availability)

• IDSET for interior: Soffit, Niches, Coffer, non-load bearing walls, plaster design




Change order:

• Once SDSET is in place, change order is at $500 per two-hour blocks of time.




Payment Schedule:

• 25% of project cost as retainer

• 50% of project cost is due once SDSET is in place.

o (Site, Exterior Elevations, Floor plan).

• 75% of project cost is due at engineering services if needed and

o [50% submittal] (Dimensions, Foundation, Framing, Roofing, Shear wall).

• 100% of project cost at time of CDSET

o [100%submittal] (MEP: Mechanical, Electrical, Plumbing, Details).

• Municipality redlines are included, corrections to undisclosed rework are charged accordingly.

• If project total is under $3001, 50% is required as retainer.

I started in drafting as a student in junior high, and later on in high school.   I perfected my math, geometry and CAD drafting skill early on and stayed in the industry over the years.   I have been subcontracting on projects over the years from building school, malls, churches, and residential homes.

Public sector

Residential

Subdivide

Be upfront about what your needs are. Find examples or product numbers of ideas that you would like incorporated.

What is realistic?

What is your time schedule?

- planning takes time and modifications takes some thought into securing that things will work correctly.

What is in budget?


Services offered

Home Modification For Disabled Persons
Architectural Services
Home Remodeling
Interior Design
3d Design & Modeling
Engineering And Technical Design